Skip to main content Skip to main navigation menu Skip to site footer
  STATIKA
  • Current
  • Archives
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Privacy Statement
    • Contact
Search
  • Register
  • Login
  1. Home /
  2. Archives /
  3. Vol. 9 No. 1 (2026): Statika Vol 9 No 1 April 2026

Vol. 9 No. 1 (2026): Statika Vol 9 No 1 April 2026

DOI: https://doi.org/10.64168/statika.v9i1
Published: 2026-06-04

Articles

  • ANALISA BIAYA DAN WAKTU PELAKSANAAN KUSEN UPVC DENGAN KUSEN KONVENSIONAL KAYU (PEMBANGUNAN PUSKESMAS PINTU PADANG)
    Ryo Wanda, Mhd. Rahman Rambe, Rizky Febriani Pohan
    1-12
    • pdf
  • ANALISIS PERBANDINGAN HARGA PEKERJAAN MENGGUNAKAN METODE BOW DENGAN AHSP 2022 RUANG KELAS BARU SDN 100702 DESA NAPA KEC. BATANG TORU
    Ummi Azizah Isnadi, Sahrul Harahap , Wirna Arifitriana
    13-22
    • pdf
  • ANALISA PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN KUSEN KAYU DENGAN KUSEN UPVC PEMBANGUNAN GEDUNG FAKULTAS HUKUM UNIVERSITAS MUHAMMADIYAH TAPANULI SELATAN
    Awal Ramadhan Hasibuan, Ahmad Rafii, Rizky Febriani Pohan
    23-33
    • pdf
  • PENGARUH PENGGUNAAN PLASTIK LOW DENSITY POLYETHYLENE (LDPE) SEBAGAI SUBSTITUSI AGREGAT KASAR PEMBUATAN BETON TERHADAP KUAT TEKAN BETON FC’18,68 MPa
    Anri Mirwan Gea, Suryanti Suraja Pulungan, Rizky Febriani Pohan
    34-39
    • pdf
  • ANALISIS KERUSAKAN RUAS JALAN MANGARAJA IMBANG KEC. PADANGSIDIMPUAN TENGGARA KOTA PADANGSIDIMPUAN
    Ali Ardiansyah Siregar, Mhd. Rahman Rambe, Rizky Febriani Pohan
    40-49
    • pdf

Download Template Artikel

 

MAKE A SUBMISSIONS

MENU UTAMA

Tentang jurnal ini

Tim Editor

Reviewer

Etika Publikasi

Panduan Penulisan

Pembiayaan

Fokus dan Ruang Lingkup

E-ISSN 2774-9509
Google Scholar
GARUDA

Information
  • For Readers
  • For Authors
  • For Librarians
About this Publishing System